Chatham Historic Dockyard Railway

Recent Works
In 2009,the locomotive underwent a partial refurbishment programme at Chatham's Historic Dockyard, the work being carried out by the Historic Dockyard Trust. Although the locomotive was generally in a good condition, mechanically, some of the metal work around the cab needed to be replaced. This involved the following work;
  • 1 cylinder head was replaced with a new one.
  • The rear of the cab was rebuilt and the
  • Locomotive repainted.
Website Design & Hosting by MANS Data Services Ltd | © CHDR 2011